ISG - Thornton Primary School, Bradford

ISG Construction - Thornton Primary School, Bradford

LOCATION:

A primary school in the Thornton area of Bradford.

SIZE:

75.0m x 2.40m (high). 2x Vehicle access gate.1x Pedestrian access gate.

HIRE DURATION: 52 Weeks
ERECTION DURATION: 5 Days
DESCRIPTION OF WORKS:

This hoarding was required to maintain a safe working area between the site and the school children. HoardTek's robust yet attractive hoarding was ideal to ensure maximum safety whilst ensuring an attractive look was maintained on site.

MATERIALS:

100% recycled uPVC external cladding panels.750KG ‘Lego’ Style Concrete Kentlege Blocks.

COMMENTS: A full scaffold design was provided.