William Anelay - Sheffield Cathedral

William Anelay - Sheffield Cathedral

LOCATION:

A large Cathedral in the centre of Sheffield.

SIZE:

138.0m x 2.40m (high). 2x Vehicle access gate.1x Pedestrian access gate.

HIRE DURATION: 52 Weeks
ERECTION DURATION: 5 Days
DESCRIPTION OF WORKS:

Refurbishment plans were in place for Sheffield Cathedral to relay new flooring around the site as well as some remidial work inside. The main contractor required a large site compound to keep the public safe whilst maintaining a place for their cabins and delivery access.

Having completed a very similar project at York Minster for William Anelay, due to this projects success HoardTek were commisioned to install a hoarding to the same specification in this area.

The same concerns over breaking the historic slabs in the area were present and the job was carried out without a problem.

MATERIALS:

100% recycled uPVC external cladding panels.750KG ‘Lego’ Style Concrete Kentlege Blocks.

COMMENTS: A full scaffold design was provided.