BAM Construction - Hull University

Bam Construction - Hull University

LOCATION: Hull University Campus
SIZE: 100m + (2.25m to 2.40m High)
HIRE DURATION: 52 Weeks
ERECTION DURATION: 1 Week
DESCRIPTION OF WORKS:

As Hull University wanted to ensure that they could keep their library operating whilst carrying out some very distruption construction works a flexible yet practical internal hoarding system was required.

HoardTek's internal hoarding products have a snap together design that allows a solid wall to be built quickly whilst still ensuring that site activities do not cross into the public side.

Over the course of the project over 100 linear meters of hoarding was used. This was dismantled and re-erected numerous times as site activities required. HoardTek provided all of the fitting and dismantling services for this.

MATERIALS:
COMMENTS: This system is available for hire and sale as well as a full erection and dismantle package offered.